Skip to content

How is lot size actually determined in a demand or operative plan?

Answer

Lot-sizing follows the configured policy for the part/planning method, not a single global rule — confirm which lot-size policy applies to the specific part before treating an unexpected quantity as an error.

← Browse Manufacturing and engineering questions